Says supply of expired drugs or those with short lifespan erodes confidence by Kenyans in public institutions
Patients in critical condition were referred to faith-based hospitals.
Says attacks on Raila misplaced.
Senate Committee on Agriculture pledged to address grievances
Ten students from each ward will benefit from scholarship
The construction of the modern kitchen cost around Sh32m while the equipment within the facility cost Sh28m.
PS Omollo confirmed that phase one of the Homa Bay jetty and pier project is 95 per cent done.
The policy comes as the county seeks ways to build resilience to climate change and other challenges facing the food system.
Barasa asked Transport CS Chirchir and KCAA to speed up the renovation of the runway to resume operations.